JMR Services Elevates Well Plugging & Abandonment in the Permian Basin

JMR Services Elevates

Midland, TX —  Leading the charge in safe and efficient well decommissioning, JMR Services continues to set the bar high for Plugging & Abandonment solutions throughout the Permian Basin. As a fully integrated provider—retaining all equipment and crews in-house—the company delivers unmatched flexibility, safety, and compliance in sealing wells that have reached the end of their productive life.

A Rigorous, Six-Step Process for Secure Well Closure

JMR employs a meticulous, six-phase P&A protocol designed to protect both land and water and reclaim sites for future use:

  1. Safety Assessment – Engineers conduct exhaustive research, analyzing site conditions and preparing detailed procedures for regulatory approval.

  2. Site Preparation – Teams address hazards, level work areas, and establish safe operating conditions before any machinery moves in.

  3. Fishing & Tubular Extraction – Using blowout preventers and specialized tools, technicians remove rods, pumps, and stuck casing safely under full well control.

  4. Cement Plugging – Placement of cast-iron bridge plugs and cement barriers isolates producing zones and safeguards groundwater. Each plug is rigorously tested to verify integrity.

  5. Site & Equipment Clearance – Wellheads and flowlines are removed or safely cut below grade, and surface equipment is dismantled following environmental protocols.

  6. Surface Reclamation – The site is restored to natural grade, with waste either buried below topsoil or transferred to approved disposal sites, ensuring long-term safety and visual restoration.

Why Operators Trust JMR Services

  • Full In-House Control – All resources, crews, and equipment are company-owned, ensuring consistent quality and rapid deployment.

  • Extensive Basin Reach – As one of the largest pure-play P&A firms, JMR supports projects across multiple oil basins.

  • Safety-First Culture – Every project is executed using rigorous safety standards and well-defined operating procedures.

  • Sustainability-Driven – JMR’s P&A work helps reduce methane emissions, protect water tables, and rehabilitate land for future use.

Merger Fuels Expansion and Capability

JMR’s recent merger with A-Plus P&A LLC and acquisition of BCM & Associates has solidified its position as the nation’s leading pure-play P&A company. Now offering 34 full-service P&A packages—including well decommissioning and reclamation—the firm expands its service capabilities and reaches into new basins while reinforcing its safety-first approach and operational efficiency.

Choose the Trusted Expert for Well Decommissioning

Operators in Midland and throughout West Texas can rely on JMR Services for safe, reliable, and efficient well abandonment. To discuss your next project or schedule a consultation, visit jmrservices.com or call (432) 618-1050.

About JMR Services
Founded in 2015 and headquartered in Midland, Texas, JMR Services began as a pure-play plugging and abandonment contractor. Since then, it has grown into the largest pure-play P&A provider in the nation, backed by deep technical expertise, safety commitment, and full integration of operations. Thanks to its recent merger activity, the company now offers comprehensive well decommissioning, reclamation, and methane mitigation services across major oil-producing basins.

FOR IMMEDIATE RELEASE

Contact:
JMR Services
Phone: +1 432-618-1050
Address: 4706 Greentree Blvd, Midland, TX 79707
Website: jmrservices.com

By Jude

Elara writes from the quiet edges of the digital world, where thoughts linger and questions echo. Little is known, less is revealed — but every word leaves a trace.